|   Login 
 
 

Deepest borehole depth of 583 meters     drilled by Mesy at the altitude of 12,000ft in     upper Himalaya. New
4 deep boreholes of Testing & Logging     completed for Geodata/BRO in upper     Himalaya. New
Completed II Phase of borehole Testing &     Logging at HZL up to the depth of 1100     meters. New
Mesy (India) Pvt. Ltd. has been awarded     ISO 9001:2008 Certification.
Representative appointed in South     America.
Mesy (India) start its Seismic profiling and     Tomography.
Starting offshore projects for Logging. New
Drilling services available now with wire     line technique. New
Completed 8 boreholes (Up to 950 Meters)     for SK, Rampura, Kayar Mines for     Hindustan Zinc Ltd. New
We have added additional services now    specially for clients of mines, tunnel, cavern,    underground storage etc with the team of    experts. New

  • Geotechnical studies including core logging and rock mass quality estimation
  • Design of rock excavation including shape, geometry, sequencing and location (using imperial and numerical modeling methods both 2D and 3D)
  • Ground instrumentation Design, installation, monitoring and data analysis/interpretation
  • Use of DATAMINE software for borehole logging, litho-modeling and 3D imaging including ground condition and all major geotechnical features.

Completed testing for underground crude oil     storage project for EIL, Paradeep. New
ECl I-Phase testing completed (boreholes     depth up to 700 m.) New


INSTRUMENTATION

MMRT was established to manufacture measuring instruments that are used primarily for civil engineering and geotechnical applications. The Products blends the current state-of--the-art instrumentation technology with our experience in geotechnical instrumentation. MMRT brings together a unique team of engineers and business graduates who have accumulated over 30 years of rich experience in this field.

  • The range of instruments has been created out of experiences in geotechniques, which ideally meet the needs of global geotechnical practices with International Standard.
  • The company also represents world’s leading manufacturers of similar products.

Geotechnical designs and construction are always subject to uncertainties. To see through a geotechnical process and monitor field performances, engineers around the world select measuring instruments to assist in answering specific questions.

Instrumentation of a structure furnishes data to determine if the completed structure is functioning as intended and provides a continuing surveillance of the structure to warn of any unsafe developments. Means and methods available to monitor physical phenomena that can lead to a structure’s failure include a wide spectrum of instruments and procedures ranging from very simple to very complex. The deployment of these instruments at different phases of the construction process yields different benefits, adding up at the end to a holistic output- Safety.

FACILITY IN MMRT

DESIGN

The MMRT design team uses advanced engineering software for designing our standard products & customizing individual products as per client’s specifications/requirements.

MANUFACTURING

MMRT Products uses precision machinery, operated by experienced and skilled technicians in an assembly-line manufacturing process.

TESTING

MMRT has within its facilities of all advanced testing equipment to test every specification of the sensors.

TRAINING

MMRT has an independent team of engineers qualified to conduct training program for clients, if required.

INSTALLATION

MMRT has experienced group of installation teams to carry out installation of our instruments in all types of projects. The team is available in a short notice to travel in any part of the world.

SERVICES

MMRT also undertake projects on turnkey basis to supply, install and monitor using own products as well as integrate with other brands.

 

 6 deep boreholes to be tested for     Geodata/BRO.
Further drilling has been taken up in upper     Himalaya for Geodata/BRO.
In-situ stress testing comprising Hydro-
    fracture with BHTV Logging
    & Dilatometer testing in different boreholes
    of Tunnel T-74R between Arpinchala
    Station to Banihal Station in Connection
    with Construction of Dharam-Qazigund
    Section of J&K Rail Link Project for
    IRCON International Limited, Banihal J&K.
BHTV (Acoustic logging, Optical     Scanning) & Themal Conductivity for KSK     Subansiri Upper Hydroelectric project in     Daporijo District at Arunachal Predesh.
KSK Hydro Power Project in India and       Nepal.
Australian Highways.
ISPRL Cavern.
ONGC Cavern.
Repeat Order for deep boreholes for     further testing and logging in HZL.
ECL II-Phase further testing to be started     soon.
Further 14 boreholes in tunnel (T3 & T4) to     be tested in IRCON, J & K.
Projects in South America.

The Web Mesy India Pvt. Ltd.
Internet Explorer